Build of bespoke marquee in No 1 Hyde Park, Knightsbridge, London.

The Event

Building project, the refurbishment of flooring in two hall ways.

The Challenge

Trafalgar & JF Marquees were approached by international engineering firm, Laing O’Rourke to provide a covering for stonemason’s whilst they were refitting flooring in the prestigious No 1 Hyde Park development in Knightsbridge for a number of weeks.

Not only was it imperative that the existing fixtures and fittings were to remain in situ and to be protected, the build time was limited to a number of days, to reduce impact to residents.

The Solution

After meeting the client onsite, we worked with our skilled in house team and supply chain to design deliver two bespoke temporary structures to be built and fitted within the hall ways.

After refining both structures in our warehouse, we were ready to install these following a tight 2 day build schedule, with both structures being dismantled 2 months later to again, in a one day take down. The project as a huge success, staying on time and on budget with no impact on existing fixtures and fittings in situ.